Volume 1: Cover Pages & Table of Contents |
I. |
Executive Summary |
II. |
Description of Proposed Action |
III. |
Existing Conditions, Impact, Mitigation |
|
A. |
Land Use, Zoning and Public Policy |
|
B.
|
Visual Character: pages 1-3
Visual Character: pages 4-17
Visual Character: pages 18-21
Visual Character: pages 22-34
Visual Character: pages 35-43
Visual Character: pages 44-53
|
|
C. |
Soils, Topography, Slopes and Geology |
|
D. |
Hazardous Materials |
|
E. |
Flora and Fauna |
|
F. |
Wetlands, Groundwater and Surface Water Resources |
|
G. |
Stormwater Management |
|
H. |
Utilities |
|
I. |
Use and Conservation of Energy - Green Energy |
|
J. |
Solid Waste |
|
K. |
Traffic and Transportation |
|
L. |
Parking |
|
M. |
Air Quality |
|
N. |
Noise |
|
O. |
Building Demolition and Construction |
|
P. |
Community Facilities and Services |
|
Q. |
Fiscal and Socioeconomic Impacts |
|
R. |
Cultural, Historical and Archeological Resources |
IV. |
Alternatives |
V. |
Significant Impacts that Cannot Be Avoided |
VI. |
Other SEQRA Required Chapters |
|
|
VII. |
Appendices |
|
Volume 2: Cover Page & Table of Contents |
|
A. |
Application Documents |
|
B. |
Environmental Site Assessment Reports (ESA) |
|
|
Appendix B1 |
|
|
• Soils Mechanics Phase I ESA |
|
|
|
• (Includes: EcolScience Phase I ESA) |
|
|
|
Appendix B2 |
|
|
|
• Soils Mechanics Phase II ESA |
|
|
|
• EcolScience Phase II ESA |
|
|
|
• Ecol Science Inc. Soil Sample Locations |
|
|
|
Appendix B3 |
|
|
• SAIC Report and |
|
|
• DEC No Further Action Letter for Former Texaco Station |
|
|
Appendix B4 |
|
|
• EHASP/CAMP |
|
|
Appendix B5 |
|
|
• Environmental Health Investigation (EHI) Asbestos & Lead Base Survey |
|
|
Appendix B6 |
|
|
• EcolScience Letter to DEC |
|
|
• EcolScience Letter to DOH |
|
C. |
Natural Resources Including Flora, Fauna and Wetlands |
|
|
• Wetlands Delineation Report |
|
|
• Field Notes |
|
|
• Tree Survey Data |
|
|
• Related Correspondence |
|
|
• Wetland Water Budget Analysis |
|
D. |
Stormwater Management Plan |
|
|
• SWPPP Part 1 |
|
|
• SWPPP Part 2 |
|
|
• SWPPP Part 3 |
|
|
|
Volume 3: Cover Page & Table of Contents |
|
E. |
Traffic Data and Analysis |
|
|
• Traffic Data Part 1 |
|
|
• Traffic Data Part 2 |
|
F. |
Air Quality Study |
|
G. |
Noise Study |
|
H. |
Light Study (Photometric Analysis) |
|
I. |
Cultural Resources Report |
|
J. |
SEQR Documentation |
|
K. |
Retail Market Analysis Commercial Character Assesment |
|
L. |
Correspondence |
|
M. |
Geotechnical Engineering Report |
|
N. |
Parking |
|
|
|
COSTCO SITE PLAN |
1 |
C-1 |
Cover Sheet |
2 |
C-11 |
Existing Conditions Plan |
3 |
C-101 |
Site Plan |
4 |
C-201 |
Grading Plan |
5 |
C-202 |
Boring Plan |
6 |
C-301 |
Utility Plan |
7 |
C-302 |
Off-Site Sanitary Sewer (Old Crompond Road) |
8 |
C-303 |
Off-Site Sanitary Sewer (Old Crompond Road) |
9 |
C-304 |
Off-Site Sanitary Sewer Profile (Old Crompond Road) |
10 |
C-305 |
Off-Site Sanitary Sewer Profile (Old Crompond Road) |
11 |
C-401 |
Erosion Control Plan |
12 |
C-501 |
As Of Right Lighting Plan - 16 ft Mounting Height |
13 |
C-502 |
Preferred Lighting Plan - 25 ft Mounting Height |
14 |
C-601 |
Site Line Sections |
15 |
C-602 |
Site Line Sections |
16 |
C-701 |
Pond Details |
17 |
C-702 |
Details |
18 |
C-703 |
Details |
19 |
C-704 |
Details |
20 |
C-705 |
Details |
21 |
C-706 |
Retaining Wall Details |
22 |
C-801 |
Highway Improvement Plan |
23 |
WC-1 |
NYCDEP Watercourse Confirmation Map |
24 |
LP-1 |
Site Landscaping Plan |
25 |
CP-1 |
Conceptual Roadway Improvement Plan Initial Condition |
|