Staples Battery Energy Storage System Expansion
Application of IPP Solar Integration, LLC for approval of a special use permit with submitted plans titled, “Staples Plaza – III, Yorktown Heights, NY,” prepared by James A. Marx, Jr. Professional Engineer, dated December 15, 2022, and last revised March 28, 2023.
It is proposed to expand the battery energy storage system by adding two Megapack Tesla battery energy storage units adjacent to the existing system. The site is located at 3333 Crompond Road, Yorktown Heights, also known as Section 36.06, Block 2, Lot 76 on the Town of Yorktown Tax Map.